Bit Of A Yarn

New Zealand's Premier Pro-Racing Forum

Often Copied - Never Bettered

Jump to content
Bit Of A Yarn

Recommended Posts

Posted (edited)

Why don't you talk about the great noms for the first 3 G1's of the season.

Well Written if I remember correctly will start in 1 or 2 before heading to Aus, wasn't that part of the deal, that Stephen Marsh was the sole determiner of HER racing career.

Willydoit back.  The new sprint star First Five in the Proisir Plate etc etc etc

Oops. and they are racing the last 2 G1's at Hawkes Bay.  Weren't the rabbit holers convinced NZTR was trying to close down racing in Hawkes Bay

Edited by hesi
Posted
1 hour ago, hesi said:

Face reality fellas, the report has been done in what is believed to be a professional way (not the social media, anonymous circus way).

I have seen very little discourse from anyone of note in the industry on social media, too busy getting on with it, I guess.  At least Chris Waller and Garry Chittick had the balls to write, respectful but robust articles with their names attached

 

Gary Chittick has had a column "Gary's Corner" on the studs website for yonks. That could possibly be classed as social media.

  • Champ Post 1
Posted

Sorry, you've lost me Hesi. I thought this thread was about PS?  Start another thread if you want to talk about the spring G1 racing. That said, I think Stephen would be pretty pleased with WW's trial today.

  • Champ Post 1
Posted

I say once bitten, twice shy.

Remember Takanini closing because there was this new "State of the Art" facility going in at Puhinui.  Takanini sat derelict for years whilst what happened at Puhinui, and what happened to those funds?

We'll all be dead and buried before any of these pie in the sky concepts come to fruition.

  • Like 2
Posted (edited)
1 hour ago, Special Agent said:

I doubt it.

Yes. No idea why anyone would think there'd be a strike. Who would strike? And what would they be striking for?

Edited by curious
  • Like 1
Posted
12 hours ago, Special Agent said:

We'll all be dead and buried before any of these pie in the sky concepts come to fruition.

Historically, as the Horowhenua Chronicle this week explains, Levin has been under the microscope since the 1910's and Foxton was subject to Royal Commissions of 1946 and 1970.

Foxton President is at a loss to explain any logic in the Project Stamina report suggesting it may be AI generated.  Levin President has no confidence in NZTR and indicates club members will continue a fight that has been ongoing.

  • Like 3
Posted
9 hours ago, Special Agent said:

Foxton President is at a loss to explain any logic in the Project Stamina report suggesting it may be AI generated.  Levin President has no confidence in NZTR and indicates club members will continue a fight that has been ongoing.

But neither Levin or Foxton can sustain themselves forever.  Eventually they will be in the same situation that Trentham is in.  Nostalgia and blind belligerance won't save either of them forever.

Posted
3 hours ago, Chief Stipe said:

But neither Levin or Foxton can sustain themselves forever.  Eventually they will be in the same situation that Trentham is in.  Nostalgia and blind belligerance won't save either of them forever.

Rubbish. 

  • Like 2
Posted
On 7/08/2026 at 3:39 PM, The Centaur said:

Good response. Perhaps Hesi could observe how many elections around the world are decided in favour of those who have embraced social media.

Many in racing have this weird phobia of offering any solutions themselves seemingly believing they aren't "brainy" enough so leave it to the charlatans who operate under the guise of consultants.

A report should consist of a mountain of figures i.e. costs, profits, equity, projections, assets & resources etc. THe idea all those figures are "confidential" is bullshit. All participants, supporters and enthusiasts must have the complete picture available.

Political parties, under the party's name, using social media to communicate policy etc etc.  

This is quite different to nameless, faceless people with, in some cases laughable posting names, posting vitriolic, sometimes personal, unsubstantiated hearsay.

I'm sure there are many things that are correct and have not been done, but posting in such an objectionable manner is counterproductive and just hardens the resolve of those running the industry.

Garry Chittick for example, he is a respected member of the racing community, who has achieved a lot, posting under his own name, on a regular column he does on his own website.  That is not social media

Posted
On 7/08/2026 at 8:07 PM, Special Agent said:

I say once bitten, twice shy.

Remember Takanini closing because there was this new "State of the Art" facility going in at Puhinui.  Takanini sat derelict for years whilst what happened at Puhinui, and what happened to those funds?

We'll all be dead and buried before any of these pie in the sky concepts come to fruition.

Especially the Waikato and Hawkes Bay Greenfields proposals. There simply isn't the money to do them without massive borrowings and we have seen what happens to Racing Clubs when that happens. Think RACE, Auckland Trotting Club AND oh don't forget Ellerslie when they built the new Public Stand about 35 years ago [Opened in 1990] and were $20 million in debt and it took a lot to get them out of it including help from the Racing Industry Board's Amenity Account which no longer exists.  

  • Like 1
Posted
16 hours ago, Chief Stipe said:

But neither Levin or Foxton can sustain themselves forever.  Eventually they will be in the same situation that Trentham is in.  Nostalgia and blind belligerance won't save either of them forever.

Their Jump-outs and Trials contribute substantially don't they?

Tell me what extra help Levin and Foxton get.

  • Like 2
Posted
11 minutes ago, Dark Beau said:

Especially the Waikato and Hawkes Bay Greenfields proposals. There simply isn't the money to do them without massive borrowings and we have seen what happens to Racing Clubs when that happens. Think RACE, Auckland Trotting Club AND oh don't forget Ellerslie when they built the new Public Stand about 35 years ago [Opened in 1990] and were $20 million in debt and it took a lot to get them out of it including help from the Racing Industry Board's Amenity Account which no longer exists.  

The Waikato Greenfields project is being funded and underwritten by the already agreed sale of Te Rapa, Cambridge and Waipa racecourses

Posted
2 hours ago, hesi said:

The Waikato Greenfields project is being funded and underwritten by the already agreed sale of Te Rapa, Cambridge and Waipa racecourses

We will see!

Oh pray tell me, who is underwriting it then?

If you are saying NZTR, where is the money coming from in the interm?

If it's the Government, such as the $20 million dollar loan to HB Racing, a change of Government could wipe that idea with the stroke of a pen.

Training at Cambridge needs to keep going whilst they build it, so a sale can't proceed, or the purchaser pay for something 3 years in advance and not get access to it.

If it's bank money it will be crippling.

Hesi, your thoughts now to the above questions and comments.

Posted
3 hours ago, hesi said:

The Waikato Greenfields project is being funded and underwritten by the already agreed sale of Te Rapa, Cambridge and Waipa racecourses

And all the while values and regulations change, costs increase.

Can anyone remember the details of Puhinui, was that underwritten by the agreed sale of Takanini?  Remind us where those proceeds went.

  • Like 1
Posted
44 minutes ago, Dark Beau said:

We will see!

Oh pray tell me, who is underwriting it then?

If you are saying NZTR, where is the money coming from in the interm?

If it's the Government, such as the $20 million dollar loan to HB Racing, a change of Government could wipe that idea with the stroke of a pen.

Training at Cambridge needs to keep going whilst they build it, so a sale can't proceed, or the purchaser pay for something 3 years in advance and not get access to it.

If it's bank money it will be crippling.

Hesi, your thoughts now to the above questions and comments.

The 3 clubs are underwriting it all.  A memorandum of understanding between the 3 was formalised ages ago.

I presume the banks will loan money as the project progresses until the sale of the 3 courses is able to be done as they have security.

Pretty standard stuff

Posted
While ⁠Waikato Thoroughbred Racing (WTR) has not published an exact combined dollar figure, property and racing industry analysts estimate the total market value of the three combined racecourses to be well over $150 million to $200+ million NZD based on recent regional zoning and development data. [1, 2]
The 145 hectares (358 acres) of total space across Te Rapa, Cambridge, and Waipā are prime development pieces. Their values are largely dictated by location and how easily they can be transformed into suburban housing or commercial blocks. [1]
1. Te Rapa Racecourse (Hamilton)
  • Estimated Value: Highest per-hectare value of the three sites (estimated $80M – $100M+ NZD).
  • Value Drivers: This 50-hectare (124-acre) track sits on prime land completely surrounded by Hamilton's industrial and residential grid.
  • Development Factor: A small 6.5-hectare chunk alone was previously carved off for high-density townhouse zoning. The remaining portion is considered a "developer's dream" that will likely command massive premium rates from major commercial and residential syndicates.
2. Cambridge Racecourse (Waipā District)
  • Estimated Value: High capital value (estimated $50M – $70M+ NZD).
  • Value Drivers: Spanning 61 hectares (150 acres), this is the largest piece of land of the three. Standard lifestyle blocks directly along Racecourse Road sell for $1.5M to $4M NZD depending on size, showing the extreme demand for local land. [1, 2, 3]
  • Development Factor: Encroaching residential subdivisions have reached the track borders. Because Cambridge is experiencing an intense housing boom, the entire parcel will yield top dollar once carved up into hundreds of high-value residential sections. [1, 2, 3]
3. Waipā Racecourse (Te Awamutu)
  • Estimated Value: Moderate development value (estimated $25M – $40M NZD).
  • Value Drivers: Covering 34 hectares (84 acres), it is the smallest of the three properties.
  • Development Factor: Under the Operative Waipā District Plan, this track is designated as a critical future growth cell. The council has already mapped the land to safely yield between 590 and 830 new homes, making its value closely tied to long-term residential subdivision profit margins. [1, 2, 3]
The Funding Strategy
WTR intends to use the staggered sales of these three legacy tracks over the next decade to entirely self-fund the multi-million dollar construction of the ⁠new 164-hectare Tamahere mega-hub. [1, 2]
 
Posted
The physical construction of the core racing and training facilities is expected to take approximately three years. [1, 2]
Because the project relies on a staged rollout, the on-site activity is split into distinct operational phases: [1]
Key Construction Phases
  • The Racecourses (3 Years): Building the physical tracks will take the full three years. The tracks will be built first so they can settle for about a year before any horses race on them. [1]
  • The Supporting Infrastructure (2 to 2.5 Years): The bloodstock sales facilities and the retirement village are scheduled to be built simultaneously, taking up to two and a half years. [1]
  • Residential Precincts (Multi-Year Staged Rollout): The lifestyle residential lots will be built and released in three stages over several years, with the first phase debuting alongside the racecourse opening. [1]
On-Site Timelines
The core construction phase is scheduled to happen over the three years prior to the targeted grand opening on 1 August 2036. [1, 2]
Depending on how quickly regulatory consents are processed and how fast the staged land sales of the current Te Rapa and Cambridge tracks clear, heavy machinery could break ground on-site as early as 2030, though it is currently formally proposed for 2032. More specifics on the exact build sequence can be tracked via the image.png.6e7e47e935386904bc65bcad7b484b4b.png⁠WTR Greenfield FAQ Page. [1, 2]
 
Posted
On 7/08/2026 at 8:07 PM, Special Agent said:

I say once bitten, twice shy.

Remember Takanini closing because there was this new "State of the Art" facility going in at Puhinui.  Takanini sat derelict for years whilst what happened at Puhinui, and what happened to those funds?

We'll all be dead and buried before any of these pie in the sky concepts come to fruition.

What's your alternative?

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...