Chief Stipe Posted 18 hours ago Posted 18 hours ago Racing Taupo Races 6-8 Abandoned Meeting Newshttps://bitofayarn.com Racing Taupo Races 6-8 Abandoned Due to unsafe track conditions Races 6-8 at Racing Taupo Wednesday 17 September have been abandoned. More information to follow Quote
Meeting Newshttps://bitofayarn.com Racing Taupo Races 6-8 Abandoned Due to unsafe track conditions Races 6-8 at Racing Taupo Wednesday 17 September have been abandoned. More information to follow
Chief Stipe Posted 16 hours ago Author Posted 16 hours ago MEATLUG (A Riddell) - Blundered just prior to the winning post. Underwent a post-race veterinary examination which found the gelding to have a slow recovery. Following the running of Race 5, Club Representatives, Jockeys, Stewards and the Track Manager examined the area of the track where MEATLUG had blundered which revealed a significant hole in the track. After deliberating, the decision was made by Stewards to abandon the meeting due to safety concerns. Report 2025-09-17 Taupo.pdf Quote
hesi Posted 14 hours ago Posted 14 hours ago Meatlug stumbling far left. Possibly a small sinkhole? Quote
Chief Stipe Posted 14 hours ago Author Posted 14 hours ago 16 minutes ago, hesi said: Meatlug stumbling far left. Possibly a small sinkhole? A tomo is the rumour. But I guess it will be NZTR's fault and the usual sad sacks will bang on about it. The plus is the horse wasn't injured. Quote
hesi Posted 13 hours ago Posted 13 hours ago Matt Ballesty's fault because he does not have any turf knowledge and is only interested in shutting down racing outside of Auckland/Waikato Quote
Shad Posted 12 hours ago Posted 12 hours ago Poor meatlug, no wonder his recovery was slow putting a hoof into something that deep. Quote
curious Posted 11 hours ago Posted 11 hours ago How long will the course have to be closed for racing while they fill and compact the hole? Quote
hesi Posted 1 hour ago Posted 1 hour ago May not be as easy a fix as some have suggested, which may put a question mark over Taupo. If it is underground subsidence, then a geotech survey of the entire track may be required. Quote
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.